East Montgomery Utility District Porter Morris road water line
Extended the Porter Morris road waterline to tap into existing service lines.
Call Us : (931) 372-0032
W&W Construction Co., LLC is a complete general contractor with a specialty niche in utility construction that provides all manner of construction services in the commercial, industrial, governmental and residential aspects of the industry. Client satisfaction is the primary objective of W&W Construction Co. W&W has succeeded in building solid relationships that form the framework of the construction process. The foundation of these relationships is reflected in the confidence our clients have with our experience and expertise. W&W views every project as a opportunity to exceed our clients expectations. With responsive leadership, qualified people, and a cooperative mindset, each new opportunity presented allows our clients to enjoy these attributes.
With our exceptional leadership, analytical skills, resources for finding solutions to unforeseen conditions and offering input for value engineering, W&W Construction has maintained a strong, lasting relationship with clients within the industry.
Extended the Porter Morris road waterline to tap into existing service lines.
The work included the line items, in the contract drawings and all incidental work needed to complete the repair and painting of the interior wall and trim in buildings 936 and 770. Patched/painted existing damage to walls. Sanded/scarify existing paint. Applied tinted primer to 13 door jams, with finishing coats of paint. Soffited ceiling to…
The work included labor, material, equipment, and incidental related work to provide C.I.P.P lining and open cut replacement of the sanitary sewer lines as indicated at the locations indicated on drawing T-1, M-1, & M-2 and specification for the project. Removal of short section of existing PVC pipe and replace with new section. Removal of…
The work included labor, material, equipment, and incidental related work to provide C.I.P.P lining and open cut replacement of the sanitary sewer lines as indicated at the locations indicated on drawings provided and to specification for the project. Installed new factory sewer manhole ring and iron cover with sanitary sewer cast into the top of the cover….
This project consisted of updating the NSA Mid-South traffic signage to the most current codes and standards based upon local, State, and Federal requirements for traffic signs. This project includes developing a survey of all existing traffic signs, analysis of traffic signs to determine if their location and type meet the requirements of the latest revision…
Project consisted of repairing sanitary sewer line feeds and manholes. Lined manholes with C.I.P.P. to prevent corrosion and root growth intrusion. Installed new factory sewer manhole ring and iron cover with sanitary sewer cast into the top of the cover. Completed all work concrete and brick work necessary to the top of the manhole allow for proper installation…
Project of interior construction work consisting of measuring and replacing worn out or broken shades and blinds. Repairing and or replacing broken or worn out stair treads with new anti slip surface.
Project consisted of stripping or priming if needed and repainting the trim and doors of Navy building 808 for the Tennessee National Guard.
Project consisted of stripping or priming if needed and repainting the interior walls and ceiling in building 808 for the Tennessee National Guard.
Project consisted of removing unnecessary greenhouse features, converting open space fit for growth of plant life to hardening house and changing the roof to a hardening house style roof.
© 2017 W&W Construction LLC.